The Stapleton family wanted to update their Shoreline bathroom with a low-profile curbless shower, porcelain mosaic flooring, and subway tile on the shower walls. Their plans also included a recessed shower niche, tiled window returns, and smooth transitions between the bathroom and adjoining flooring. Before installation could begin, we identified several conditions that required additional planning. The original shower pan specification did not match the planned rear linear drain, the existing shower subfloor showed movement, and one wall was out of alignment by approximately ½ inch over six feet. Our approach focused on resolving these issues during preparation so the new shower, waterproofing, and tile assembly could be installed around the existing conditions.
We began with an onsite walkthrough on October 12, 2026, to review the existing conditions and confirm the installation requirements. By October 16, the revised shower pan and linear drain had arrived, the self-leveling underlayment was nearly dry, and the remaining tile-setting materials were onsite. The project was still in preparation, with shower assembly and tile installation ahead.
The Homeowners' Goals and Remodeling Plan
The remodeling plan covers approximately 68 square feet of bathroom flooring, 15 square feet of shower flooring, and 82 square feet of shower walls. The homeowners selected porcelain mosaic tile for the bathroom and shower floors, along with porcelain subway tile for the shower walls.
The planned curbless shower requires a low-profile pan, a properly coordinated drain and floor slope, and waterproofing around the existing window and recessed niche. Our scope also includes preparing and leveling the bathroom floor and finishing the transitions to the adjoining flooring.
October 12 Walkthrough: Existing Floor and Wall Conditions
During our October 12 walkthrough, we inspected the existing bathroom floor, shower framing, drain location, and wall alignment. We also reviewed the homeowners' tile selections, recessed niche placement, and transitions between the bathroom and adjoining flooring.
The inspection revealed several conditions that needed attention before installation. The specified shower pan did not match the planned rear linear drain, the existing plywood subfloor showed movement, and portions of the wall framing required further evaluation. We also needed to confirm clearances around the existing plumbing and establish the finished floor height before installing the new shower assembly.
Correcting the Drain Plan: From Center Drain to Rear Linear Drain
The installer could not simply use the originally specified pan, because the drain position and shower slope have to match. During the walkthrough, we discussed a thin 60-by-36-inch single-slope pan compatible with the rear linear drain. A rear linear drain needs the shower floor and supporting assembly to direct water toward it, so the pan, drain body, plumbing connection, and finished tile elevations have to be coordinated as one installation.
We coordinated the revised shower pan and drain requirements with the installation team. On October 13, the new 60-by-36-inch single-slope pan and rear linear drain were delivered to the property. Before installation, we still needed to confirm the plumbing connection, framing support, and final slope requirements to ensure the shower assembly would be compatible with the existing conditions.
Shower Subfloor Movement and the Joist-Lowering Kit
During the October 12 inspection, we identified movement in the existing shower subfloor and possible uneven areas beneath the planned pan location. A curbless shower requires careful control of the floor elevation, so the stability of the plywood, existing framing, plumbing clearances, and drain connection all needed further evaluation.
A joist-lowering kit arrived on October 12 as part of the original installation plan. Because the shower configuration had changed from a center drain to a rear linear drain, we still needed to verify how the lowering system would work with the revised pan before proceeding. As of October 16, no structural modifications had been confirmed as complete.
Bathroom Floor Preparation and Self-Leveling
The renovation includes preparing approximately 68 square feet of bathroom flooring for the new porcelain mosaic tile. On October 12, we delivered the primer and self-leveling materials needed to address the existing floor conditions and create a suitable substrate for installation.
By October 16, the self-leveling work had progressed substantially. Leonardo inspected the floor and found the self-leveler almost completely dry. Anatoly planned to continue the remaining floor preparation that day, but the floor was not yet confirmed ready for tile installation.
Meeting the Adjoining Floor
The homeowner wanted the new tile to meet the adjacent flooring as evenly as practical. During the walkthrough, we estimated a height difference of about ¼ to ⅜ inch between the bathroom area and the neighboring floor. The selected porcelain mosaic is about 3/16 inch thick, and the installer had to account for the tile, setting mortar, preparation materials, and final transition profile when establishing the finished height.
The carpet-side entry was especially important, because the mosaic needed to meet the adjoining carpet as evenly as possible. The team selected Bright White Schluter profiles for the doorway transitions. We'll confirm the final transition height once the floor preparation and tile installation are complete.
Tile, Grout, and Trim Selections
By October 12, the homeowner had selected the porcelain mosaic floor tile, about 3/16 inch thick, for the bathroom floor and the shower floor. The homeowner also chose Antique White grout for the floor and shower walls. The shower walls will use porcelain subway tile about 5/16 inch thick in a horizontal 50% offset layout, which affects how cut tiles land at corners, the window, and the niche.
The homeowner selected Bright White Schluter trim for the shower niche, window, and doorway transitions. We also reviewed bullnose tile as a possible finish for the exposed shower-wall edges. On October 15, we finalized the grout and matching silicone requirements, and the remaining installation materials arrived on October 16. These selections will help create consistent finishing details around the shower, window, niche, and adjoining floor transitions once tile installation begins.
Shower Wall Alignment: A Half-Inch Discrepancy Over Six Feet
On October 13, Leonardo reviewed the shower wall alignment with the installer. The team found a discrepancy of about ½ inch over a 6-foot wall run, and a second wall showed a similar condition. The installer said the existing condition could not be used as it was for the intended tile installation. That matters because an uneven wall affects grout-line consistency, corner transitions, the tiled window, and the niche, especially in an offset layout.
We identified the need to correct the wall alignment before proceeding with the planned tile installation. As of October 16, the required adjustments were still being coordinated.
HydroBlok Panels, Recessed Niche, and Window Waterproofing
The shower-wall installation covers approximately 82 square feet and includes waterproof backer panels, treated joints, and properly detailed transitions to the shower pan. As of October 16, the final wall-board configuration still needed confirmation before installation.
The recessed niche is planned to measure approximately 12 by 24 inches and include a shelf. The available framing bay is not centered, so the niche position follows the existing wall framing, and its height has to work with the tile layout so the grout joints and cuts look intentional. The existing shower window will have tile returns and full waterproofing with Bright White Schluter trim. The niche, window, and doorway trim should match where those profiles are used.
Quality Control and Remaining Adjustments
As of October 16, 2026, the bathroom remodel remained in progress, with preparation underway for the curbless shower and porcelain tile installation. The revised shower pan and rear linear drain were onsite, and the self-leveling underlayment was nearly dry.
Before moving into the main installation, our team still needed to address the shower-wall alignment, verify the pan and drain configuration against the existing framing, and complete the required waterproofing preparation around the niche and window. Resolving these conditions is important to establishing the intended shower slope, tile layout, and finished transitions.
Project Results
By October 16, 2026, we had completed substantial preparation for the Stapleton family's bathroom renovation. The revised 60-by-36-inch shower pan and rear linear drain had been delivered, and the bathroom floor's self-leveling underlayment was nearly dry. The homeowners had also finalized their porcelain tile, Antique White grout, and Bright White Schluter trim selections.
Our early work identified several important conditions that needed to be addressed before installation, including movement in the shower subfloor, a mismatch between the original pan specification and planned drain location, and uneven shower-wall framing. Identifying these conditions during preparation allows us to coordinate the necessary corrections before installing the waterproofing and finished tile.
The bathroom remodel remains in progress. Our next steps include confirming the shower pan and drain installation requirements, addressing the wall alignment, and completing the waterproofing preparation before moving into porcelain tile installation.