    Kitchen Remodeling · Burien, WA

    Kitchen Remodel with Retained Cabinetry in Burien, WA

    In progress

    Trisha and TJ Martin wanted to modernize their Burien kitchen while keeping the existing cabinetry wherever possible.

    Kitchen under renovation with cabinet doors removed and the island bases exposed.

    Project: Kitchen remodel with cabinet refacing, porcelain countertops, and heated tile flooring

    Client: Trisha and TJ Martin

    Location: Burien, WA 98146

    Cabinetry: Planned cabinet refinishing, replacement doors and drawer fronts, and desk-area conversion

    Surfaces: Planned porcelain countertops and full-height backsplash

    Flooring: Approximately 207 sq. ft. of planned heated tile flooring

    Lighting: Dimmable under-cabinet LED strips

    Work Period: October 2026-present

    Project Status: In progress

    Contents
    1. The Homeowners' Goals and Existing Kitchen Conditions
    2. Measuring the Kitchen and Planning the New Installation
    3. Selective Demolition and Protecting Reusable Components
    4. Cabinet Refacing and the Desk Conversion
    5. Pantry Storage, Pullouts, and Internal Organization
    6. Porcelain Countertops, Sinks, and the Full-Height Backsplash
    7. Heated Tile Floor: Scope, Concrete Preparation, and Buildup
    8. Electrical Rough-In and the Heated-Floor Circuit
    9. Under-Cabinet LED Lighting, Switches, and Ceiling Speakers
    10. Quality Control and Remaining Adjustments
    11. Project Results

    Trisha and TJ Martin wanted to modernize their Burien kitchen while keeping the existing cabinetry wherever possible. Instead of replacing every cabinet, they chose to update the visible finishes, install new doors and drawer fronts, improve storage, and convert an outdated desk-height area into functional cabinetry at standard countertop height.

    The planned renovation also includes porcelain countertops, a full-height backsplash, heated tile flooring, and dimmable under-cabinet LED lighting. Because the homeowners want to preserve much of the existing kitchen, our approach focuses on integrating these upgrades with the current cabinets, plumbing, electrical systems, and appliances.

    Construction began on October 12, 2026, with selective demolition and protection of the components the homeowners wanted to reuse. By October 16, most of the initial demolition was complete, electrical upgrades were underway, and materials for the heated tile floor had been delivered. As of that date, the project remained in its early construction phase, with cabinet modifications, countertop installation, and new flooring still ahead.

    The Homeowners' Goals and Existing Kitchen Conditions

    During our October 12 walkthrough, we reviewed the kitchen with TJ and confirmed which existing elements would remain. The homeowners wanted to preserve the cabinet bases, selected glass display doors and shelves, internal storage components, lighting features, and existing appliances while updating the kitchen's appearance and functionality. Their priorities included refinished cabinetry, improved storage organization, a more useful replacement for the existing desk area, new countertop and backsplash materials, heated tile flooring, and integrated lighting.

    Some of the existing storage components required additional review before we could determine whether they should be reused or replaced. We set aside the glass doors, shelves, and display lighting for preservation and planned careful removal of components attached with adhesive to avoid damaging the surrounding cabinetry.

    Measuring the Kitchen and Planning the New Installation

    During our October 12 walkthrough, we measured the approximately 13-by-15-foot kitchen, including its 6-by-7-foot island, existing countertops, windows, and doorway trim. These measurements helped us plan the cabinet modifications and determine how the new finishes would fit within the existing layout. Because the cabinetry will be modified before the new porcelain countertops are installed, the countertop fabricator will take final measurements once the cabinets are ready. This sequencing helps ensure that the new surfaces fit the completed cabinet layout.

    Selective Demolition and Protecting Reusable Components

    We began by protecting the kitchen components Trisha and TJ wanted to reuse. On October 12, protective materials went down while the demolition crew prepared to start, and the refrigerator moved into the dining area to open the kitchen. The homeowners planned to reuse their existing appliances. The original demolition scope covered the countertops, backsplash, affected floor finishes, cabinet doors, drawer fronts, toe kicks, and required trim. The team identified the glass cabinet doors, shelves, and lighting components before anything was removed.

    During our October 13 walkthrough, we reviewed the progress of the initial demolition and identified the remaining areas for removal. On October 16, work continued with removal of the existing stone countertops, while reusable lighting components were set aside for protection. Final countertop measurements will follow once the cabinet modifications are complete.

    Cabinet Refacing and the Desk Conversion

    The plan is to keep the existing cabinet bases and update them with new doors, drawer fronts, and homeowner-selected hardware. The visible surfaces will be refinished to match the new components, while selected sections will be modified or rebuilt to improve storage.

    The desk conversion is the largest layout change. The approved proposal calls for raising the desk-height area and building new cabinet components to match the adjacent cabinets. An existing waste pipe occupies part of the construction area, so the new cabinetry must be built around it. The final arrangement also has to account for countertop height, internal storage, plumbing access, and the relationship to neighboring cabinets.

    Pantry Storage, Pullouts, and Internal Organization

    The planned cabinet updates include pantry modifications, spice pullouts, a narrow storage pullout, organized drawers near the stove, and dedicated storage for baking trays. We are also reviewing which existing pullouts can be incorporated into the updated cabinetry to preserve useful components wherever possible.

    During our October 15 planning review, we identified areas where the under-cabinet lighting equipment could affect the available storage space. We're coordinating the electrical and cabinet layouts before making modifications so the new lighting can be integrated without unnecessarily reducing storage capacity.

    Porcelain Countertops, Sinks, and the Full-Height Backsplash

    The renovation calls for porcelain countertops and a full-height backsplash extending to the underside of the upper cabinets or another approved stopping point. New backsplash drywall can stay unfinished where the slab will cover it completely, while exposed transitions need proper drywall finishing.

    Trisha and TJ selected their kitchen sink, bar sink, and new bar faucet, which were onsite by October 16. They also plan to reuse their existing kitchen faucet. We're coordinating the plumbing connections and final fixture dimensions before countertop fabrication to accommodate the new surfaces and existing kitchen layout. The homeowners are also considering a built-in wireless phone charger in the countertop. During our October 15 review, we discussed its possible location, electrical requirements, and clearance beneath the surface. The feature remained under consideration as of October 16.

    Heated Tile Floor: Scope, Concrete Preparation, and Buildup

    We're planning approximately 207 square feet of heated kitchen flooring, with about 225 square feet of tile to allow for cuts and waste. The planned tile is about 12 by 24 inches, and the heating system is SunTouch or an approved equivalent with a thermostat and floor-temperature sensor. Before installing the heated tile floor, we plan to grind the existing polished concrete to prepare the surface. During our October 13 planning review, we selected a preparation approach using vacuum-assisted dust collection and an air scrubber to help control dust while working around the cabinetry and appliances the homeowners intend to keep.

    The finished floor is expected to build up about ¾ to 1 inch. That height affects toe kicks, appliance clearances, and the doorway, where a Schluter metal transition was discussed. The heating membrane, floor-heating materials, and thinset arrived on October 15. We planned approximately two to three days for concrete preparation before tile installation, while Trisha would make the final selections for the grout color and metal transition finish.

    Electrical Rough-In and the Heated-Floor Circuit

    The kitchen renovation includes electrical improvements to support the new lighting, heated flooring, and updated fixtures. During our October 12–13 walkthroughs, we reviewed the existing circuits, switches, outlets, and planned connections for the floor-heating system.

    On October 15, our electrician inspected the garage electrical panel and identified existing circuit conditions that required additional work. By October 16, the lighting circuits had been separated from the receptacle loads, while other kitchen and bar electrical improvements remained underway. The dedicated heated-floor circuit and final electrical inspection were still pending.

    Under-Cabinet LED Lighting, Switches, and Ceiling Speakers

    Trisha and TJ wanted dimmable under-cabinet LED lighting that would provide additional illumination while integrating with the kitchen's updated cabinetry. During our October 13–15 discussions, we developed a plan for lighting beneath the main cabinets and along the bar cabinetry, with the LED strips operating together from a dimmer near the kitchen entrance.

    The proposed installation also includes updated switches and electrical devices to coordinate with the new finishes. The homeowners plan to replace the existing round ceiling speakers with square models, which will require drywall adjustments around the openings. As of October 16, final lighting details and controls were still being coordinated.

    Quality Control and Remaining Adjustments

    The October 13 walkthrough also noted discoloration at one cabinet corner near an older liquid spill. The cause was not established, so the team planned to remove the trim and clean beneath the affected area. We also needed to coordinate drywall repairs around the new ceiling speakers and finalize the matching trim details for the kitchen island.

    Project Results

    By October 16, 2026, the renovation had moved through most of its initial demolition phase. We had protected the existing cabinet components Trisha and TJ wanted to preserve, begun the electrical upgrades, and received materials for the planned heated tile flooring.

    The project is designed to give the homeowners an updated kitchen without requiring a complete replacement of their existing cabinetry. The planned improvements include refinished cabinet surfaces, more functional storage, a converted desk area, porcelain countertops, a full-height backsplash, and heated tile flooring.

    Construction remains in progress, with cabinet modifications, concrete preparation, countertop fabrication, and finish installations still ahead. We will continue coordinating these stages around the existing kitchen layout and the homeowners' selected materials.