The Kampson homeowner wanted to replace the kitchen and pantry flooring with natural stone while keeping the existing cabinets, countertops, appliances, and adjoining floor finishes. The project covered approximately 97 square feet of 12-by-24-inch natural stone tile in the Redmond home, with particular attention to how the new floor would meet the surrounding hardwood and linoleum.
The two transitions required different solutions. At the hardwood junction, the homeowner approved a Schluter metal edge for a defined finish. The existing linoleum near the laundry and hallway had an uneven cut, so a straight metal profile would have made that irregularity more noticeable. After reviewing the condition together, we agreed to use matching flexible sealant at that junction instead. We also compared grout samples against the installed stone before the homeowner selected Graystone.
We finalized the project scope on August 27, 2026. By our September 9 walkthrough, natural stone installation was well underway across the kitchen and pantry, and the new tile was setting flush with the adjoining floors. The homeowner had also approved the grout color and both transition approaches. The project remained in its finishing stage, with the final flooring inspection still ahead.
The Homeowner's Goals and Existing Floor Conditions
The existing kitchen had several finishes that needed to remain untouched during the flooring renovation. Cabinets and countertops stayed in place, while hardwood on one side and linoleum near the laundry and hallway created two different transition conditions. We planned the stone installation around those existing surfaces rather than altering the adjoining rooms.
The homeowner supplied 12-by-24-inch natural stone tile, with extra material for cuts and waste. We planned a straight tile layout and prepared for limited leveling where needed, using the existing subfloor rather than rebuilding the entire floor assembly. Protecting the cabinetry and managing the finished height at the adjoining floors were important parts of the installation.
Subfloor Preparation and Cement Backer Board
Our installation plan called for a ¼-inch cement backer board across approximately 97 square feet, with limited leveling where necessary to prepare the existing substrate for natural stone tile. The project did not require a complete floor reconstruction.
By September 9, natural stone installation was underway across the kitchen and pantry. The tile was being fitted within the existing floor layout, with particular attention to the adjoining hardwood and linoleum surfaces.
Selecting and Installing the 12-by-24-Inch Natural Stone Tile
Natural stone brings variation in shade, texture, and veining, so the individual tiles needed to be considered as part of the overall floor rather than as identical manufactured pieces. The homeowner selected 12-by-24-inch tiles for a straight layout across the kitchen and pantry.
On September 9, the installer was working through the remaining stone tiles, with tile setting scheduled to finish that day. The floor would then need time to cure before grouting. The installation plan called for Custom ProLite setting material or an approved equivalent.
Confirming Floor Height and the Relationship to Adjacent Surfaces
Keeping the new stone level with the adjoining floors was a key part of the installation. Natural stone, hardwood, and linoleum have different thicknesses and underlying floor assemblies, which can make their meeting points difficult to finish neatly.
During our September 9 walkthrough, the new stone was setting flush with the surrounding floors. We reviewed each junction separately and worked with the homeowner to select a suitable finish for the existing conditions. The hardwood side called for a defined metal edge, while the uneven linoleum side needed a more flexible approach.
Choosing Graystone Grout on the Installed Stone
During our September 9 walkthrough, we compared grout samples directly against the installed natural stone. The variations in the stone's color and veining made it useful to see the grout beside the actual tiles rather than to choose from a sample alone. The homeowner selected Graystone, along with matching flexible silicone for the appropriate joints and transitions.
Graystone grout and matching silicone were scheduled for delivery on September 10. Grouting would follow once the tile had cured sufficiently.
Sealing the Natural Stone Before Grouting
The flooring plan included sealing approximately 97 square feet of natural stone before grouting. Natural stone can absorb moisture and staining materials, depending on its composition and porosity, so the sealer was intended to help protect the tile during the finishing process. This treatment was planned before grout application.
Kitchen-to-Hardwood Transition With a Schluter Edge
At the kitchen-to-hardwood junction, the homeowner approved a Schluter metal edge to create a defined transition between the two materials. The selected profile was already on-site during our September 9 walkthrough. It was intended to provide a neat boundary between the new natural stone and the existing hardwood without changing the surrounding flooring.
Adapting the Transition to the Existing Linoleum
The second transition connects the stone to existing linoleum near the laundry or hallway. Unlike the hardwood edge, this junction has an existing irregularity, because the linoleum was cut in a visibly wavy line. A straight Schluter profile would have created a rigid visual reference immediately beside that uneven cut and made the waviness more noticeable.
After reviewing the linoleum edge with the homeowner, we agreed to use matching flexible sealant rather than a straight metal profile. The sealant would follow the existing irregular cut and coordinate with the selected Graystone grout, allowing us to finish the junction without drawing unnecessary attention to the uneven linoleum. This approach also preserved the surrounding flooring instead of expanding the renovation into another area.
Protecting Cabinets and Countertops During Tile Installation
The renovation focused on the flooring, so the existing kitchen cabinets, countertops, and appliances needed to remain undamaged. During our September 9 walkthrough, we reviewed protection measures for the cabinet faces and countertops and planned to limit foot traffic while the newly installed tile cured. This allowed us to work on the kitchen floor without extending the renovation to the surrounding finishes.
Quality Control and Remaining Adjustments
During our September 9 walkthrough, we reviewed the natural stone installation with the homeowner. The new tile was setting flush with the adjoining floors, and we confirmed the Graystone grout selection and separate transition details for the hardwood and linoleum edges. These decisions helped keep the new flooring coordinated with the existing kitchen finishes.
By September 16, the project had reached its finishing stage, with the final flooring inspection still ahead. The remaining review would cover the grout, stone sealing, flexible joints, and finished transitions before the project could be completed.
Project Results
By September 9, 2026, natural stone tile installation was well underway across approximately 97 square feet of kitchen and pantry flooring. The 12-by-24-inch tiles were setting flush with the adjoining hardwood and linoleum, while the existing cabinetry, countertops, and appliances remained in place.
One of the key decisions involved finishing the transitions between different flooring materials. The homeowner approved a Schluter metal edge at the hardwood junction and matching flexible sealant along the uneven linoleum edge. We also selected Graystone grout together after comparing samples against the installed natural stone.
The new stone floor was taking shape without changes to the surrounding kitchen finishes. Final grouting, sealing, and transition details were the remaining steps toward completing the flooring renovation.