    Garage Renovation · Carnation, WA

    Two-Garage Renovation in Carnation, WA: New Flooring and Restored Storage

    In progress

    Ginny and Doug wanted to renovate two garages at their Carnation home without replacing the storage systems they already used.

    Detached garage with an open overhead door and a coated floor.

    Project: Main and detached garage renovation with exterior and interior improvements

    Client: Ginny and Doug

    Location: Carnation, WA 98014

    Main Garage: Concrete preparation, crack repairs, decorative flake floor coating, painting, and storage reinstallation

    Detached Garage: Vapor-barrier coating, decorative flake floor finish, and custom vacuum alcove finishing

    Heating: Two replacement electric wall heaters

    Exterior: Garage soffit, trim, and roof-edge repairs

    Additional Work: Fireplace mantel refinishing and selected interior improvements

    Work Period: August-present

    Project Status: In Progress

    Contents
    1. The Homeowners' Goals and Initial Garage Conditions
    2. Main Garage Preparation: Removing Flooring and Grinding Concrete
    3. Garage Wall and Ceiling Painting
    4. Concrete Crack Repairs and Decorative Flake Floor Installation
    5. Reinstalling Garage Storage and Replacing the Wall Heaters
    6. Exterior Soffit, Fascia, and Garage Roof-Edge Repairs
    7. Detached Garage: Vapor Barrier and Decorative Flake Floor Coating
    8. Custom Floor Finishing Around the Vacuum Alcove
    9. Fireplace Mantel Refinishing and Additional Interior Improvements
    10. Quality Control and Remaining Adjustments
    11. Project Results

    Ginny and Doug wanted to renovate two garages at their Carnation home without replacing the storage systems they already used. The main garage needed its existing floor removed, damaged concrete prepared, a new decorative finish installed, and cabinets and workbenches returned to their original functions. The detached garage needed a matching floor finish, including a recessed storage area that required extra attention around existing utilities.

    The project also involved replacing two electric wall heaters, repairing exterior soffit and trim above the garage doors, and refinishing an interior fireplace mantel. These improvements required several stages of preparation, installation, and coordination because the garages had different floor conditions, fixed equipment, and construction schedules.

    Our approach was to improve both garages while preserving the storage and equipment the homeowners wanted to keep. We prepared and repaired the existing concrete, installed decorative flake flooring in both spaces, and restored the main garage's storage systems. The detached garage also received a matching finish in a recessed vacuum alcove. With the flooring work completed, the project moved into its remaining electrical, threshold, and finishing adjustments.

    The Homeowners' Goals and Initial Garage Conditions

    On August 24, 2026, Ginny and Doug met with Ben and Vlad from Alta Group Remodeling to walk through both garages and discuss their renovation plans. The homeowners wanted to renew the garage floors while preserving their existing cabinets, workbench, and storage accessories. They also discussed replacing two older electric wall heaters, repairing the exterior above the garage doors, and completing several interior improvements.

    Working in the main garage meant dealing with several features that couldn't simply be moved out of the way. Existing cabinets and a workbench occupied portions of the floor, while the furnace, water heater, steps, garage-door openings, and center support column created areas that required careful preparation. The mechanical equipment was to remain in place during the flooring work.

    Maintaining a comfortable temperature in the garage was another priority for Doug, who wanted the space to stay at least 55°F. We installed two replacement electric wall heaters to support that goal, with final control adjustments and performance verification still pending.

    Outside, the team observed that the fascia above the garage doors was uneven, with the right side noticeably lower than the left. The condition raised concerns about how rainwater moved along the garage roof edge. The project scope therefore included localized exterior repairs in addition to the garage renovations.

    Main Garage Preparation: Removing Flooring and Grinding Concrete

    The main garage had an existing tile floor that needed to be removed before we could prepare the concrete for its new decorative coating. The original scope also required temporary removal and later reinstallation of the existing cabinetry and workbench.

    To prepare the main garage for its new floor, we temporarily relocated the existing cabinets and refrigerator to the detached garage. This gave our crew access to the concrete without requiring the homeowners to replace storage components they still wanted to use.

    We mechanically ground the floor, removed the remaining surface material, and cleaned the exposed concrete to prepare it for the decorative coating. The work required careful attention around the garage perimeter, steps, center support column, and existing mechanical equipment. The furnace and water heater remained in place throughout the process, so our crew protected them while preparing the surrounding concrete.

    Proper surface preparation was essential to the installation. Removing old material and grinding the concrete provided a suitable substrate for the new coating, including the areas around fixed equipment and changes in floor elevation.

    Garage Wall and Ceiling Painting

    The main garage renovation also included painting the walls and ceiling to refresh the space alongside the new flooring. We prepared the surfaces with KILZ Mold & Mildew Interior/Exterior Primer before applying paint.

    Working around exposed pipes, mechanical equipment, garage-door tracks, windows, and electrical components required careful masking and surface protection. Although the original painting plan focused on the wall behind the cabinets and washer, the work expanded to other wall and ceiling areas as the renovation progressed.

    Concrete Crack Repairs and Decorative Flake Floor Installation

    Before installing the decorative flake coating, we completed additional surface preparation using mechanical grinding and dust-extraction equipment. We opened, cleaned, and repaired visible cracks in the concrete, then removed the remaining dust and debris to prepare the floor for coating.

    After completing the repairs, the crew staged the decorative flake materials near the garage entrance and applied the coating throughout the prepared area. The installation covered the main floor, perimeter, entry, steps, and areas surrounding the center support column. The team checked the decorative finish for consistent coverage and cleaned the garage after application.

    We allowed the new coating to cure before reinstalling the homeowners' cabinets, shelving, and workbenches.

    Reinstalling Garage Storage and Replacing the Wall Heaters

    The homeowners wanted their garage storage restored rather than replaced with an entirely new cabinetry system. Once the floor coating had reached the required stage for reinstallation, Alta coordinated the return and arrangement of the existing storage components. By September 21, the garage storage work was substantially complete.

    We reinstalled the existing tall cabinets, wall-mounted cabinets, slatwall panels, hooks, and storage accessories, preserving the organization system the homeowners already used. The restored layout allowed the garage to retain its original storage functions alongside the new flooring.

    We also installed two replacement electric wall heaters to address the homeowners' heating needs. The installation was complete, while adjustments to the heater controls and final performance verification remained part of the ongoing project.

    Exterior Soffit, Fascia, and Garage Roof-Edge Repairs

    The homeowners also needed repairs to the exterior above the garage doors. Uneven fascia and concerns about rainwater movement along the roof edge made this an important part of the renovation. Our completed exterior work focused on the garage overhang and soffit, with additional roof-edge conditions considered during planning.

    On September 10, the crew removed sections of existing soffit to expose and inspect the framing above the garage doors. They installed replacement soffit panels, fitted trim and batten pieces, and secured the new components around the overhang.

    Fastener locations and joints were filled or patched as needed, followed by exterior painting. The team also inspected transition points where the overhang met the siding and adjoining roof sections, with additional touch-up work around soffit, fascia, siding, and trim.

    To blend the repaired sections with the house, we matched the existing Sherwin-Williams SuperPaint Exterior Flat in SW 7009 Pearly White.

    Detached Garage: Vapor Barrier and Decorative Flake Floor Coating

    We moved on to the detached garage after finishing the main garage floor. During the October 2 walkthrough, Alta documented surface variations and markings near the pedestrian entry door, as well as questions about the threshold and remaining floor-finishing work. These conditions required coordination with the floor-finishing contractor before the final decorative surface could be completed.

    On October 6, Epoxy Bros applied a vapor-barrier coating across the detached garage concrete slab. The glossy vapor-barrier coating covered the slab up to the walls and garage entrances, with some earlier concrete repair lines still visible underneath. The decorative flake finish would go on next. The surface needed to remain protected before the next application.

    On October 7, the detached garage received its gray, black, and white decorative flake finish. The finish extended across the open floor, along the perimeter, and toward the overhead garage-door entry. The team also documented the coating edge where the garage meets the existing exterior concrete driveway. Photographs taken with the overhead door open and partially lowered showed the finished floor at the entry.

    Several follow-up items still required verification, including the manufacturer's curing requirements, release for foot traffic and vehicles, final coating edges, and any remaining touch-ups. The team also needed to check overhead garage-door clearance, the bottom weather seal, and a previously reported water-intrusion concern near the threshold.

    Custom Floor Finishing Around the Vacuum Alcove

    One distinctive part of the detached garage renovation was a recessed, raised area containing a wall-mounted vacuum.

    Ginny and Doug wanted the new flooring to continue into the recessed vacuum alcove rather than leave it with a different surface finish. This required working around existing pipes, a valve, an electrical box, and conduit while keeping those components accessible. We extended the matching decorative flake finish into the alcove, creating a more consistent appearance across the detached garage without altering the existing utility connections.

    Fireplace Mantel Refinishing and Additional Interior Improvements

    Although the garage renovations were the primary focus, Alta also carried out selected improvements inside the home.

    One of the more involved interior tasks was refinishing the existing wood fireplace mantel to coordinate more closely with the surrounding hardwood flooring.

    On August 20, the crew sanded the mantel back to bare wood. During the following review, the team identified a color-matching challenge: the mantel wood had reddish undertones that differed from the existing floor. The homeowners and crew considered treatment options to reduce the red coloration before choosing a final stain. A red-reducing treatment was applied on August 26, but the initial application produced little visible change. An additional coat followed on August 27, when Ginny requested treatment across the entire mantel. The crew protected the surrounding stone fireplace, cabinets, walls, and hardwood floors while preparing test areas for stain and finish samples. Different sections were evaluated before a darker finish was applied to the mantel face and supporting details.

    By September 11, the mantel had a darker finish that preserved the natural wood grain and brought its appearance closer to the surrounding hardwood flooring without creating an exact color match. We also installed a new light fixture, mirror, and towel hanger in the downstairs powder room and caulked the backsplash. Upstairs bathroom work included towel-hanger installation, alignment, and paint touch-ups. The team also installed a vent cover above the downstairs bedroom door and completed selected drywall, paint, and fixture-related touch-ups.

    Quality Control and Remaining Adjustments

    As of October 2026, the project remains in progress. Both garages have received their decorative floor coatings, and the main garage's storage systems have been reinstalled.

    Our team is continuing with final heater-control adjustments, checks around the detached garage threshold and weather seal, and selected interior finishing details. A final project walkthrough is still pending.

    Project Results

    The renovation has already delivered several of the improvements Ginny and Doug wanted for their Carnation home. Both garages have received matching decorative flake flooring, while the main garage retains its existing cabinets, workbenches, and storage accessories. In the detached garage, the new finish also extends into the recessed vacuum alcove, creating a consistent surface around the existing utility connections.

    Additional completed work includes the installation of two replacement electric wall heaters, repairs and painting around the garage exterior, and refinishing the fireplace mantel to better coordinate with the hardwood flooring. The project remains in progress, with final heating adjustments, threshold checks, and selected finishing work still pending.